This project utilizes a
350kW generator set as an emergency backup power system. During mains power outages, it ensures continuous power supply to key areas of the school, such as teaching buildings and dormitories, guaranteeing the normal life and study of teachers and students. The project is equipped with a remote monitoring system, allowing real-time viewing of the operating status, facilitating timely handling of anomalies by maintenance personnel, and extending equipment lifespan. It also features an intelligent control system that supports automatic start-up, load switching, and fault monitoring functions, enabling rapid power restoration within 10-15 seconds after a mains power outage. Since its commissioning, the project has operated stably and has earned the trust of the client.